How long must an operator wait after filing a notification with the Utilities Technology Council (UTC) before operating on the 2200-meter or 630-meter band?
After notifying the Utilities Technology Council, an operator may begin 2200- or 630-meter operation after 30 days if not told the station is within 1 kilometer of a relevant PLC system.